[NMR Pipe Protector Verification Results] Teikoku Theatre Building
The red rust issue in the piping that occurred 21 years ago has been completely resolved! There has been no leakage, and the piping condition has been maintained in good shape.
The heat source equipment of the Imperial Theatre uses steam boilers and turbo chillers, and since the theatre dislikes noise, the heat source is installed six floors underground. Additionally, most of the piping is located within concrete, making pipe renewal work extremely difficult. To improve the current situation, where significant deterioration due to red rust in the piping has progressed after 34 years since its construction in 2000, the "NMR Pipe Protector" was installed to convert red rust into black rust and rehabilitate the piping. As of 2021, 21 years later, all issues related to red rust in the piping have been resolved, and there is almost no iron content from red rust in the circulating air conditioning chilled and hot water. Since the installation of this product, there has not been a single instance of leakage, and the piping condition has been maintained in extremely good shape. [Effects After Installation] - All issues related to red rust in the piping that existed 21 years ago have been resolved. - There is almost no iron content from red rust in the circulating air conditioning chilled and hot water. - There has not been a single instance of leakage, and the piping condition has been maintained in extremely good shape. *For more details, please refer to the PDF document or feel free to contact us.
- Company:日本システム企画 東京本社
- Price:Other